Due to the unique topography of the project area, which includes high desert regions of the Antelope Valley, high mountains of the San Gabriel Mountain range and dense urban areas of the San Fernando Valley, tunnels are utilized throughout the project section. These tunnels are used to address topographic constraints (high mountains), and avoid and reduce impacts to communities, habitat and facilities above (homes, freeways, etc.). With the complex geological conditions and fault zones within the tunneling areas, key considerations were accounted for in the design elements, such as type of tunnel, seismic fault chambers, access points, sound mitigation and safety. The approximate length of tunnels in the Palmdale to Burbank Project Section is 22 to 28 miles.

首选替代方案 SR14A 包括四个总长 28 英里的隧道。

隧道类型

隧道掘进机动画

隧道演示

隧道演示

深度图

隧道深度图 SR14A
(首选替代方案)

隧道深度图 SR14A v2

隧道深度图 SR14
                                 

隧道深度图 Refined SR14 v2

隧道深度图E1A

隧道深度图 E1A v2

隧道深度图 E1

隧道深度图 E1 v2

隧道深度图 E2A

隧道深度图 E2A v2

隧道深度图 E2

隧道深度图 E2 v2

路线比较

此表提供了从 Palmdale 的 Spruce Court 到 Burbank 站的每个备选方案的信息,包括不同的设计特征和隧道段长度。

门户示例

门户示例 1
门户示例 2
以前
下一个